Voortman has created the CNC beam drill line standard today using proven technology. Advantage-2 processes 150 tons of steel an average of once a week. The Advantage-2 is highly efficient in drilling, milling and tapping as well as countersinking.

Advantage-2 employs support clamps that ensure the best rigidity for the workpiece. Carbide tool lives are best maintained with as little vibration as is possible.

Voortman makes machines for GSS Machinery in order to meet our exact specifications. GSS Machinery targets small- to medium-sized fabricators, while Voortman targets larger fabricators. Voortman has been designing machines for GSS Machinery since more than 10 years. GSS Machinery is Voortman's largest customer globally.

The CNC Beam Drill Line has been an immediate hit with the small to medium fabricator fabricating both structural steel and miscellaneous metals. Since it was introduced in 2003 more than 600 CNC Drill Line have been installed around the world, and this amazing machine has changed the lives of many a steel fabricator.

Cnc Drill Line Qt

Cnc Drill Line Qt

The UNIST MQL lubricant has evolved to be the most popular coolant system in America over the past ten years. It is now standard equipment on Aveger FORTY, Avenger PLUS, and Clipper. This low-intensity lubricant, which is oil-based, promotes longer tool life. It is safe for use.

Peddimat has a simple, intuitive interface that is easy to understand.

0 Center Drill

Voortman developed Raptor 3DCAD/CAM Software, which takes CNC innovation to the next level by allowing users to program more quickly and accurately. The 3D platform allows you to inspect, modify, and export part information. This, combined with Voortman CNC technology, means maximum fabricator capacity.

We believe that, based on current pricing, the customer is better served with good quality Ocean Penetrator Twist Drill Bits and a good sharpener.

0 Center Drill

Q Drill

Voortman AccuMeasure Roller Feed measurement equipment offers saw measurement options. AccuMeasure provides complete handling versatility while offering a simple, streamlined CNC solution. This allows for both a drill and saw to be disassembled, which maximizes production.

The Franklin HD145(3) spindle CNC drill is available in 44-inch width. The HD-145 can carry beams upto 750 lbs/foot. Hi-performance spindles provide drilling capabilities of up to 2,000 rpm. This rigid design delivers extremely high feed rates of up 300 surface feet per hour. You can have the Franklin HD145 equipped with various material handling packages, from 300 lbs per ft to 750lbs per ft.

Beam Drill Lines

".. This machine is designed for Structural fabricators. But I knew it would work well for drilling trucks frames. The assembly was flawless due to the machine's repeatability and accuracy. Avenger drills one channel for a truck in just two hours. We would have taken 16 hours if it was done manually. The machine has increased our productivity AND profitability !.."

Voortman is the man behind today's CNC beam drilling line standard. He has used time-tested technology. Advantage-2 processes 150 tonnes of steel per week on average. It is the most efficient way to drill, mill, tap, and countersink.

0 Center Drill

Check our other pages :

Cnc Drill Line Lading Tracking

Not only will the CNC Drill Line process beams and columns, but it also easily processes all steel profiles including channel, angle, flat bar, base plates, RHS, square, and round profiles.

5-Axis Renishaw Calibration – The calibration unit is a Renishaw model APCA45 with a modified spherical stylus. The device has a retractable cover and air purge to clear debris & dust during the activation process. It mounts to a swing arm controlled by a pneumatic rotary, so it is out of the way during regular operation and swings into the calibration position for calibration only.

Cnc Drill Line Dirt

Frequently Asked Questions

For small buildings, the distance between two reinforced columns is between 3-4m and 6-9m. Larger facilities that require large columns and lots of free space will have to be at least 6-9m. A distance of 5m is acceptable for ordinary structures. The maximum span is 7.5, while the minimum is 2.5m.

Direct push technology is often called DPT. It uses the static weight combined with a hydraulic wrench to advance instrumentation or tooling through the subsurface. The drill cuttings cannot be removed from the hole unlike rotary.

Manufacturers limit beams to 60 feet due to transport issues. Others can make beams up to 80 feet long. The longest supported span using LVL is 80 feet. It is normal for continuous LVL spans to be between 20'-30'.

To resist and redistribute load, beams should bend. The girders on the other side are more rigid as they support the beams and provide horizontal support to the structure. The girder is designed to support large, all-encompassing loads like beam responses or structural pillars.

For small buildings, the distance between two reinforced columns is between 3-4m and 6-9m. Larger facilities that require large columns and lots of free space will have to be at least 6-9m. A distance of 5m is acceptable for ordinary structures. The maximum span is 7.5, while the minimum span is 2.5m.